Photo Gallery Our photo gallery is organized by project. Click on the link under each project to view the photos. The photos provided are a small sampling of projects we have performed. |
|
| The Newseum Washington, DC Rigging of artifacts (Berlin Wall and Tower / World Trade Center Antenna, etc) into The Newseum |
Philadelphia Shipyard Transporting 140 Ton Turbine / Generator Set at Philadelphia Ship Yard for barge shipment to Newport News, VA |
|
National Institute of Health Installation of 120 Ton chiller at N.I.H. |
Transformer Move Rigging and Transporting of 150 Ton Transformer for local utility |
|
Naval Academy – Wright Bros. Replica Rigging and installation of Wright Brothers Replica at The U.S. Naval Academy Dining Hall |
Marine Corps Museum Rigging and Installation of display at The U.S. Marine Corps Museum |
|
MRI Magnet Unloading and rigging of MRI Magnet at Healthcare Facility |
Veterans Day Parade Participation in the Veterans Day Parade |
|
The Awakening Transporting “The Awakening” Sculptue from Haines Point to the Gaylord Center at The National Harbor |
Scud Missile Display Unloading, rigging and setting of Scud Missile Display at Defense Intelligence Agency |
|
Steel Mill Relocation of 120 Ton Bow Segment for Steel Mill |
Theme Park Ride Installation Erection of Steel Theme Park Attractions |
|
Denver International Airport Installation of Record Setting Lear Jet at Denver International Airport |
U.S. Capitol Removal of The Statue of Freedom from atop the U.S. Capitol |
Home | Services | Equipment | Safety | Testimonials | History | Contact Us |
Hutchinson International Corporation |